Progress and Status
What's been done:
Excavation
Foundation
Timber Frame Raising
Stud and sheathing walls
External joists
Roof insulation
Metal roofing
Interior wall framing
Rear Deck Building
Window and Door installation
Siding
What's in progress:
Frame sanding
Electrical
Plumbing
HVAC
What's to come:
Wall insulation
Frame and ceiling varnishing
Drywall
Painting
Flooring
Stairs building
Kitchen cabinets, faucet, appliances
Bathroom cabinets, fixtures, faucets
Light fixture installation
Front Entry Deck
Railing inside house
Railing on back deck
Furnishing
To do external to house:
Grading
Well
Septic Tank
Gas Tank
Driveway
Landscaping
Party Patio